MENU
Logo Made in Germany SAUDI BUILD 2017

Perfect circles with the TTR circular formwork!

A 3,000 m³ fresh water tank, formed with TTR and Modular


A circular water tank with a capacity of 3,000 m³ was constructed as part of the renovation of the fresh water system in the Algerian Province of Chlef.
Chiali SERVICES Spa, a 100% subsidiary of the Chiali GROUP, that has also been carrying out public infrastructure construction projects for several years, used formwork systems from PASCHAL for the construction of the concrete tank.

The long-term and cooperative partnership that has existed since 2008 is characterised by regular training courses both on site and at PASCHAL's headquarters.
TTR formwork units
The TTR formwork units for the concreting of the 40 cm thick reinforced concrete wall rise up 6 metres high. They are positioned on upstand base plate that are sloped inwards.

In this way, it is ensured that the product upgrades and optimisations for the formwork and shoring systems are put to the best possible use in Algeria.

Formwork experts from Steinach accompanied their Algerian colleagues during the first formwork processes for the fresh water tank, so that the subsequent formwork and concreting work could be coordinated independently by the Algerian formwork experts.

www.paschal.de/english/news/article/ttr-circular-for...

Exhibitor: Paschal-Werk G. Maier GmbH

Your personal organizer

Your personal organizer

Print list  |  Save as PDF
TOPWERK Group
Booth number: Hall 3 329-3
MASA GmbH
Booth number: Hall 3 315-3
KO-BiZ
Booth number: Hall 3 231-3